Method Statement: Polyurethane Liquid Waterproofing

Method statement PS-MS-04: polyurethane liquid waterproofing on roofs, terraces and balconies, from preparation and priming to coats and testing.

This method statement covers application of the Petroseal polyurethane liquid waterproofing system on concrete roofs, terraces, balconies and podiums, including primer, reinforcement at details, multi-coat application and testing.

Consumption is recorded per area and wet film thickness is checked every 10 m², giving consultants a clear quality record at handover.

Key specifications

Values shown are taken from the published brochure/TDS. Project acceptance follows the approved batch certificate and consultant specification.

Document
PS-MS-04, 3 pages
System
Petroseal PU coating, primer + 2 coats, 1.5 – 2.0 kg/m²
Recoat window
Minimum 6 hours, maximum 48 hours
Conditions
+5 °C to +35 °C, RH below 65%, substrate moisture ≤ 5%
Rain / traffic / cure
4 hours / 24 hours / 7 days
Testing
Wet film checks and flood test, about 50 mm for at least 48 hours

Applications

  • — Roofs and podiums with complex geometry
  • — Terraces and balconies
  • — Industrial floors